Homepage | Set Home | Add to Favorites
Member

Zhejiang Dingxin Steel Tube Manufacturing Co.,Ltd


Products
  • No Category
Search
 

Friends links

Alloy Steel Seamless Tube 20Mn2 40Mn2
Click image to view full size image
Product: Views:170Alloy Steel Seamless Tube 20Mn2 40Mn2 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2023-07-01 06:39
  Inquiry
Details

GB/T 3077 is for alloy structure steels. It defines the hot rolled and forging alloy structure steels’ dimension, tolerance, technical requirements, etc. Main materials are 20Mn2, 30Mn2, 40Mn2, 45Mn2, 50Mn2, 27SiMn, 20Cr, 40Cr, 30CrMo, 35CrMo, 42CrMo, etc.

 

Product Details

 

Product name

Alloy steel seamless tube 20Mn2 40Mn2

Standard

GB/T 3077 Alloy structure steels

Material

20Mn2 30Mn2 35Mn2 40Mn2 45Mn2 50Mn2

Dimension

OD: 16-245mm, WT1-32mm, Length: 3-6m

Delivery condition

Stress Relieved, Quenched and tempered

Certificate

ISO 9001, IATF 16949

Applications

Automotive suspension part, such as bushing, tie rod, tension pulley, drag link, stabilizer link, torque rod, etc.

Packaging

Long pipe: hexagonal bundles with steel-hooped

Short cut pipes: wooden box or metal frame

 

Chemical Composition

 

Steel Grade

C

Si

Mn

20Mn2

0.17-0.24

0.17-0.37

1.40-1.80

30Mn2

0.27~0.34

0.17~0.37

1.40~1.80

35Mn2

0.32~0.39

0.17~0.37

1.40~1.80

40Mn2

0.37-0.44

0.17~0.37

1.40~1.80

45Mn2

0.42~0.49

0.17~0.37

1.40~1.80

50Mn2

0.47~0.55

0.17~0.37

1.40~1.80

 

Alloy Structure Steel Mechanical Properties For Quenched And Tempered

 

Material

Tensile strength (Mpa)

Yield  strength(Mpa)

Elongation (%)

No less than

20Mn2

785

590

10%

30Mn2

785

635

12%

35Mn2

835

685

12%

40Mn2

885

735

12%

45Mn2

885

735

10%

50Mn2

930

785

9%

 

FAQ

 

1. Q: Are you a trading company or manufacturer?

      A: Dingxin is a profession steel tube manufacturer locating in Jiaxing City, Zhejiang Province.

 

2. Q: How long is your delivery time?

      A: Generally it takes 30-50 days to manufacture the pipes.

 

3. Q: What is your term of payment?

      A: 30% advance payment, 70% balance against B/L copy or L/C at sight.

 

4. Q: What is the trade term?

      A: Trade terms could be FOB, CIF, CFR, DAP, etc.

 

5. Q: What is port of landing?

      A: Shanghai port or Ningbo port.

 

http://www.dingxinsteeltube.com/

Inquiry